ST. JOHN BOSCO HIGH SCHOOL
ST JOHN BOSCO HIGH SCHOOL clearBELLFLOWER, CA
PHOTOS
SPECS
NAME:
LOCATION:
PRODUCT USED:
COMPLETED:
OCTOBER 2021
BELLFLOWER, CA
18MM ACHIEVE RUBBER: 308 GRAY
ST. JOHN BOSCO HIGH SCHOOL
ACHIEVE
PROJECT INFO
CHAMPIONSHIPS AREN’T BUILT ALONE. COACH STEVEN LO, DIRECTOR OF S&C AT ST. JOHN BOSCO HIGH SCHOOL, UNDERSTANDS THAT IN ORDER FOR THE BRAVES TO TRAIN AT THEIR BEST, STRONG PARTNERSHIPS ARE A MUST.
COACH STEVEN LO WAS A DREAM TO WORK WITH FROM THE VERY BEGINNING. HE HAD A VISION FOR THE NEW FOOTBALL WEIGHT ROOM BUT WAS OPEN TO ADDITIONAL IDEAS AND SUGGESTIONS. IN FACT, PRIOR TO RECRUITING PLAE'S HELP, THERE HAD ALREADY BEEN A DESIGN MOCKED UP BUT THERE WERE TWO COLUMNS THAT CAUSED SOME LIMITATIONS. OUR TEAM, THROUGH DISCOVERY AND BRAINSTORMING WITH COACH LO, WERE ABLE TO CREATE AN ALTERNATE ROOM DESIGN THAT TOOK THE COLUMNS OUT OF THE EQUATION - THIS WOULD END UP BEING THE FINAL ROOM DESIGN. WHILE THIS JOB PRESENTED ITS CHALLENGES DUE TO SPACE AND INFRASTRUCTURE, IT WAS ONE OF THE MOST ENJOYABLE BECAUSE OF THE RELATIONSHIPS BUILT WITH COACH LO, THE FOOTBALL STAFF AND THE FACILITIES DEPARTMENT AT ST. JOHN BOSCO.
THE NEW ST. JOHN BOSCO FACILITY RAISES THE BAR FOR WHAT'S POSSIBLE WITH HIGH SCHOOL TRAINING FACILITIES ACROSS THE COUNTRY.