Case Study – Surfit

SURFIT LENNOX HEAD, AU PHOTOS SPECS

slide1 slide2 slide3 slide4 slide5 slide6 slide7 slide8 slide9 slide10 slide11

Slide NAME: LOCATION: PRODUCT USED: PROJECT NOTES: LENNOX HEAD, AU ATTACK:
     BLUE
     BLACK SLED TRACK W/ WHITE BORDER
     WHITE LINE MARKINGS
     CUSTOM WATERJET CUT NUMBERS
STEALTH ACOUSTIC MITIGATION:
     LIFTING AREA & FREEWEIGHTS
12MM CROSSGRIND
SURFIT STEALTH ATTACK PROJECT INFO ADRIAN STEELE BUILDING DESIGN & DRAFTING THE SURFIT TEAM APPROACHED PLAE TO CONSULT ON THE DESIGN OF THEIR NEW FACILITY IN BEAUTIFUL LENNOX HEAD NSW. THIS WAS THEIR SECOND GYM AND THEY WANTED TO CREATE A UNIQUE EXPERIENCE AS SOON AS YOU WALKED THROUGH THE DOORS.

LOCATED INSIDE A SHOPPING CENTER PRESENTED A SPECIAL CHALLENGE WITH THE ACOUSTIC REQUIREMENTS FOR THE LIFTING AND FREE WEIGHTS AREA. THE SOLUTION WAS TREATING THE AREA WITH OUR STEALTH SUSPENDED ACOUSTIC FLOOR SYSTEM TO MITIGATE SOUND AND VIBRATION MAKING THE AREA COMPLIANT WITH THE ACOUSTIC REQUIREMENTS.

THE CLIENTS FIRST SITE DID NOT FEATURE ANY TURF, SO THEY WANTED TO EXPLORE SOME OPTIONS UTLIZING IT. BY ADDING A FUNCTIONAL/MOBILITY AREA WITH BLUE TURF, IT CREATED MORE USABLE SPACE, COMFORT AND SAFETY. A CUSTOM NUMBERED, SLED TRACK ADDED THE FINISHING TOUCHES TO COMPLETE THIS AMAZING FIT OUT.


COMPLETED: ATTACK: BLUE, BLACK SLED TRACK W/ WHITE BORDER, LINE MARKINGS & CUSTOM WATERJET CUT NUMBERS
STEALTH ACOUSTIC MITIGATION: LIFTING AREA & FREEWEIGHTS
12MM CROSSGRIND
JULY 2020
CROSSGRIND GENERAL CONTRACTOR: HUTCHISON BUILDERS ARCHITECT:

Slide VIEW OTHER CASE STUDIES
  • Philadelphia, PA
    Philadelphia Eagles
  • Baltimore, MD
    Under Armour
  • Logan, UT
    Utah State University